Display 298 - 303 from 496
Sort by:
Ljubović, Podgorica
ID: 382/25
€ 2 500 / Monthly
New premises for rent in the gray phase, 126m2, entrance from 3 sides. Ideal location, suitable for all purposes! The price of the monthly lease is 2500e.
126
m2
Donja Gorica, Podgorica
ID: 194/24
€ 450 000
The villa is fully equipped with quality and modern furniture. It has three bedrooms, one of which is a master bedroom with a terrace and jacuzzi. It has two bathrooms, a storage room and a laundry...
3
Room
2
Bathroom
150
Donji Kokoti, Podgorica
ID: 377/25
€ 56 500
A plot of land in Donji Kokoti with an area of 753 m2 is for sale. The lot has a 5m wide asphalt driveway, water, electricity and lighting along the lot. Price 75e m2. Permitted construction of...
753
Dobra Voda, Bar
ID: 376/25
€ 165 000
Location: Dobra Voda (Municipality of Bar), approx. 1.5 km from the sea, with an excellent sea view. Purpose: Tourist residential development Urban-technical conditions (UTU): Maximum gross building...
1227
Pržno, Budva
ID: 367/25
€ 255 000
The apartment is located on the first floor of a smaller building and has an attached terrace of about 15 m2, which is not registered. The building is 90 m from the sea, and 200 m from the main city...
1
57
Dobrsko Selo, Cetinje
ID: 360/25
€ 176 200
Zemljište se nalazi na 35 minuta udaljenosti od Podgorice. Ima pogled na Skadar lake. Na zemljištu su upisana dva objekta stambena zgrada i pomoćni objekat. Zemljište je idealno...
10001
Zagorič, Podgorica
ID: 374/25
€ 500 / Monthly
Stan se nalazi na 1. spratu novogradnje. Na odlićnoj lokaciji kod osnovne škole i vrtića. Zgrada ima lift. Stan je potpuno opremljen.
45
Prijevor, Budva
ID: 373/25
€ 2 050
Commercial spaces for sale in in Prijevor, Budva. Suitable for various purposes, these units offer an excellent investment opportunity in a growing part of the city. The peaceful surroundings,...
Zabjelo, Podgorica
ID: 372/25
€ 186 000
Two-bedroom apartment under construction for sale, ideal for living or investment. It is located in a modern residential building scheduled for completion in September 2027. The apartment is designed...
104